Replace Historic Scotty’s Castle Climate Control System (DEVA 236143)

Replace Historic Scotty’s Castle Climate Control System (DEVA 236143)

Our team worked with the National Park Service on this design-bid-build project at the historic Scotty’s Castle. Our team removed the existing water source heat pump (WSHP) heating, ventilation, and air-conditioning (HVAC) system at the Castle Main House and Annex and replaced it with a new four-pipe boiler/chiller system with air handling units (AHUs).

Location

Death Valley National Park, California

Client

National Park Service

Cost

$8.6M