Design-Build Zone 8 Emergency Operations Center (EOC)

Design-Build Zone 8 Emergency Operations Center (EOC)

Tepa constructed a 21,044 square foot (SF) Emergency Operations Center (EOC) to serve as an alternate base command post for backup operations in emergencies that may cause base shutdowns. The facility is comprised of three functional areas: an 11,944 SF EOC, a 6,900 SF alternate command post, and a 2,200 SF facility for emergency management.

Location

Tyndall Air Force Base, Florida

Client

USACE Mobile District

Cost

$17M