Repair Four Bridges

Repair Four Bridges

Tepa provided services for this design-build project to demolish and upgrade four single-lane reinforced concrete bridges. The Tepa team designed and constructed four new 500 linear foot (LF) bridges over the waterway and improved 1,000 LF of roadway through the area. The new roadway approaches and bridge segments are designed for two-way traffic and speeds between 35 to 45 miles per hour. Tepa used over 37,000 tons of soil to raise the roadway profile grade to meet the minimum 1-foot clearance over the Water Surface Elevation (WSEL) for a 100-year storm.

Location

Beale Air Force Base, California

Client

9th Contracting Squadron (9 CONS)

Cost

$11.5M