Design-Build Zone 8 Emergency Operations Center (EOC)
Division
Construction Services
Location
Tyndall Air Force Base, Florida
Tepa Company
Roundhouse PBN-Tepa EC Joint Venture
Cost
$17M
Tepa constructed a 21,044-square-foot (SF) Emergency Operations Center (EOC) to serve as an alternate command post for backup operations in emergencies that may cause Base shutdowns. The facility is composed of three functional areas: an 11,944 SF EOC, a 6,900 SF alternate command post, and a 2,200 SF facility for emergency management.