Design-Build Zone 8 Emergency Operations Center (EOC)

Design-Build Zone 8 Emergency Operations Center (EOC)

Division

Construction Services

Location

Tyndall Air Force Base, Florida

Tepa Company

Roundhouse PBN-Tepa EC Joint Venture

Cost

$17M

Tepa constructed a 21,044-square-foot (SF) Emergency Operations Center (EOC) to serve as an alternate command post for backup operations in emergencies that may cause Base shutdowns. The facility is composed of three functional areas: an 11,944 SF EOC, a 6,900 SF alternate command post, and a 2,200 SF facility for emergency management.